Mozambique

image
  • Project : Mozambique
  • Date :2012
  • Location :Mozambique
  • Rig :20 Tonne 6x6 Rig
  • Type of Testing :CPTs

In Situ was involved in a large geotechnical investigation for one of Rio Tinto’s exploration projects in Mozambique. The job entailed carrying out over 200 CPTs in the densely vegetated jungle of Jangamo close to the town of Inhambane.

The point of the project was to look at the density of the high mineral sands as there have been issues with cemented layers. CPTs were decided to be the best technique to quickly investigate this potential problem. The ground conditions were mostly dunes, some of them very large, which meant testing down to depth of nearly 50m.

All of the tests were carried out using In Situ’s 20 tonne 6×6 truck, but due to the dense vegetation and the roughness and difficulty of the dune environment, the biggest challenge for this project was mobilisation and moving from one position to the next. However, working closely with the client, we managed to overcome all challenges and completed all the set out positions in a period of 5 months.

Working Since 2008

Quality Testing
anywhere in the world

Follow us on You Tube
Watch our latest video of 2022 in pictures!