This site had been identified for the installation for a windfarm, the site was agricultural land and was unsuitable for the wheeled CPT truck, however the blue tracked crawler was perfect for the terrain.

This project involved 2 CPTS and a Seismic Dilatometer test at each of the 12 wind turbine locations. In addition to the In situ testing a borehole was also carried out at each location.

Over a period of 2 weeks the project was completed and performed well. The client was impressed by the quality and amount of data obtained from the CPTU and Seismic testing.